Tom Price Conveyor System
Client Tidal Solutions

Project Details
Tidal Solutions recently awarded a fabrication package to Host Group which requires multiple conveyor trusses, modular structures, handrails and grating.
The Host team has already delivered a priority package with the majority of works to be completed over the next 2 months.
Belmont Forum Shopping Centre Expansion
Client Cooper and Oxley
Project Details

Wheatstone Blow Pipe Spools
Client Bechtel
Project Details

Clients & Projects


Host Group was recently awarded the Belmont Forum Detailing, Fabrication and Erection of Structural Steel.
The package is to fabricated & erected over the next 2 months which includes 40 tonnes of structural steel.

Host Group was recently awarded a package of work for the Wheatsone Project through Bechtel (WA).
The team is currently preparing for a priority delivery and of processed spools, backing rings and flanges.
Old Mandurah Bridge Formwork
Client Georgiou

Project Details
Host Group Commercial & Industrial have commenced work on the fabrication of the Mandurah Bridge formwork and design of the hydraulic lifting system including locking pins.
Fabrication of the 100t plate structure has commenced with installation to commence during the first weeks of August.

Wheatstone Ship Steel Loose Components
Client Bechtel

Project Details
Host Group Maintenance & Engineering deliver various packages to the Bechtel Wheatstone Project. In February 2016, the Host team were enaged to deliver various structural parts including fasteners, structural plates and fabricated items.
Three packages were completed consisting of over 500 parts totalling 8 tonnes which were delivered in 3 weeks from placement of order.

Maintenance Consultation
Maintenance Consultation
Client Brockwaste

Project Details
In February 2016, Host Group Support Services were engaged to supply professional maintenance personnel to the Global Renewables Shenton waste treatment facility.
The team were mobilised within 1 week of the request and supported to the onsite client team with HSE compliance, maintenance planning and system established.

OKHA Cam Shaft Replacement
Client Woodside

Project Details
In December 2015, the Host Group Australia Henderson team with WES engineering were enaged to urgenctly source a replacement cam shaft for the Woodside OKHA platfrom.
The project required urgent procurement of the required replacement parts and refurbishment of the existing upon receipt.